
BULLETIN
THE 2nd Floor Work Begins
The windows on the second floor will soon be created, with demolition of the block walls probably starting on Tuesday. Today, Monday, the demolition team will be creating their second floor work space by installing temporary walls between the demo zone and the public area. This will also involve the protection of the carpet.
Please begin to message the second floor patrons that there will be a noise element until the middle of the afternoon for awhile. Remind them that Haskett can provide them a quiet morning space, and that the other branches can as well during their open hours.
AND REMEMBER: BLOG, DON’T EMAIL
In order to save trees and cyberspace, the Hard Hat gazette will be automatically posted by Tony Lam on the blog: http://publiclibraryservices.blogspot.com/ Tony will not be sending out an email notice, rather staff without email can check the blog weekly for updates
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home